Karafa J., Golias M.M., Ivey S., Saharidis G.K.D. and Leonardos N. “The berth allocation problem with stochastic vessel handling times” International Journal of Advanced Manufacturing Technology, 2013; 65(1-4): 473-484. Abstract
Azad N., Davoudpour H., Saharidis G.K.D. and Shiripour M. “A new model to mitigating random disruption risks of facility and transportation in supply chain network design” International Journal of Advanced Manufacturing Technology, 2013; DOI 10.1007/s00170-013-5404-0. Abstract
Saharidis G.K.D. and Ierapetritou M.G. “Speed-up Benders decomposition using maximization density cut (MDC) generation” Annals of Operations Research, 2013; 210(1): 101-123. Abstract
Tang L., Jiang W. and Saharidis G.K.D. “An improved Benders decomposition algorithm for the logistics network design problem with capacity expansions of existing warehouses” Annals of Operations Research, 2013; 210(1): 165-190. Abstract
Azad N., Saharidis G.K.D., Davoudpour H., Malekly H. and Yektamaram S.A. “Strategies for protecting supply chain networks against facility and transportation disruptions: An improved Benders decomposition approach” Annals of Operations Research, 2013; 210(1): 125-163. Abstract
Golias M.M., Saharidis G.K.D., Boile M. and Theofanis S. “Scheduling of inbound trucks at a cross-docking facility: bi-objective vs bi-level modeling approaches” International Journal of Information Systems and Supply Chain Management, 2012; 5(1): 20-37. Abstract
Saharidis G.K.D., Androulakis I.P. and Ierapetritou M.G. “Model building using bi-level optimization” Journal of Global Optimization 2011; 49(1): 49–67. Abstract
Saharidis G.K.D., Boile M. and Theofanis S. “Initialization of the Benders master problem using valid inequalities applied to fixed-charge network problems” Expert Systems With Applications 2011; 38(6): 6627-6636. Abstract
Saharidis G.K.D., Golias M.M, Boile M., Theofanis S. and Ierapetritou M.G. “The berth scheduling problem with customer differentiation: A new methodological approach based on hierarchical optimization” International Journal of Advanced Manufacturing Technology 2010; 46(1-4): 377-393. Abstract
Saharidis G.K.D., Minoux M. and Ierapetritou M.G. “Accelerating Benders method using covering cut bundle generation” International Transaction in Operational Research 2010; 17(2): 221-237. Abstract
Zhang T., Saharidis G.K.D., Theofanis S. and Boile M. “Scheduling of inbound and outbound trucks at cross-docks: modeling and analysis” Transportation Research Record: Journal of the Transportation Research Board 2010; 2162: 9-16. Abstract
Saharidis G.K.D. and Ierapetritou M.G. “Improving Benders decomposition using maximum feasible subsystem (MFS) cut generation strategy” Computers and Chemical Engineering 2010; 34(8-9): 1237-1245. Abstract
Foteinou P., Yang E., Saharidis G.K.D., Ierapetritou M.G. and Androulakis I.P. “A mixed-integer optimization framework for the synthesis and analysis of regulatory networks” Journal of Global Optimization 2009; 43(2-3): 263-276. Abstract
Saharidis G.K.D. and Ierapetritou M.G. “Scheduling of loading and unloading of crude oil in a refinery with optimal mixture preparation” Industrial and Engineering Chemistry Research 2009; 48(5): 2624-2633. Abstract
Saharidis G.K.D. and Ierapetritou M.G. “Resolution method for mixed integer bi-level linear problem based on decomposition technique” Journal of Global Optimization 2009; 44(1): 29-51. Abstract
Saharidis G.K.D., Minoux M. and Dallery Y. “Scheduling of loading and unloading of crude oil in a refinery using event-based discrete time formulation” Computer and Chemical Engineering 2009; 33(8): 1413-1426. Abstract
Golias M.M., Saharidis G.K.D., Boile M., Theofanis S. and Ierapetritou M.G. “The berth allocation problem: Optimizing vessel arrival time” Maritime Economics and Logistics 2009; 11(4): 358-377. Abstract
Shah N., Saharidis G.K.D., Jia Z. and Ierapetritou M.G. “Centralized-decentralized optimization for refinery scheduling” Computer and Chemical Engineering 2009; 33(12): 2091-2105. Abstract
Saharidis G.K.D., Kouikoglou V. and Dallery Y. “Centralized and decentralized control policies for a two-stage stochastic supply chain with subcontracting” International Journal of Production Economics 2009; 117(1): 117-126. Abstract
Saharidis G.K.D., Dallery Y. and Karaesmen F. “Centralized versus decentralized production planning” RAIRO Operational Research 2006; 40: 113-128. Abstract